Wednesday, May 30, 2007
Our Budget
This is the most Frequently Asked Question, so here it is, straight from the hip:
Our max budget:
325,000=construction costs for 2500 square foot energy efficient SIP home
77,500=3 acre lot cost
25,000=soft costs (home/septic design, structural & septic engineering)
55,000=swimming pool (16 ft x 40 ft)
TOTAL=$482,500
However, we may swallow the soft costs and pay for that out of our own pocket.
We'll let you know if we go over or under this budget. We will try to reduce the construction costs as much as possible.
Our max budget:
325,000=construction costs for 2500 square foot energy efficient SIP home
77,500=3 acre lot cost
25,000=soft costs (home/septic design, structural & septic engineering)
55,000=swimming pool (16 ft x 40 ft)
TOTAL=$482,500
However, we may swallow the soft costs and pay for that out of our own pocket.
We'll let you know if we go over or under this budget. We will try to reduce the construction costs as much as possible.
Subscribe to:
Post Comments (Atom)
1 comment:
I'll be following your progress with interest. We are looking at entering the owner/builder fray ourselves, albeit on a less grand scale. Good luck!